upperbeam.gif (1182 bytes)
  utblogo3.gif (2594 bytes)factorut4.gif (2984 bytes)
 Questionnaire
Contact Us

Front Page

Questionnaire
Ask for a quotation on  our SBR's, fill out this form.

 

 

 

 

 

 

 

 

 

 

 

 

   Tqcs_thmb.pcx (5148 bytes)
. .

Separating Water from Waste

 
Please answer the following questions and submit this form to FACTOR UTB.
Project Name and Site:
Please fill in the data for the project name and location of the site.

Influent Characteristics:

     
1.. Design Flow Average (ADWF) m³/day
2.. Peak Daily Flow (PDWF/4 hours) m³/hours
3. Peak Wet Weather Flow (PWWF/3 hours) m³/hours
4.. BOD (5 day - 20ºC) mg/l
5.. COD (5 day - 20ºC) mg/l
5a. RBCOD if available mg/l
6.. Total Suspended Solids (TSS) mg/l
7.. Dissolved Solids (TDS) mg/l
8.. Ammoniacal Nitrogen as Nitrogen mg/l
9.. Total Kjeldahl Nitrogen (TKN) mg/l
10. Total Phosphorus (P) mg/l
11. pH
12. Alkalinity (CaCO3) mg/l
13. Industrial Liquid Waste  
  Type:
  Contents:
14. Site Elevation m
15. Wastewater Temperature °C
  Minimum daily average °C
  Maximum daily average °C
16. Air Temperature °C
  Summer average (warmest month) °C
  Winter average (coolest month) °C

Required Effluent Criteria:

 
1. BOD (5 day - 20ºC) mg/l
2. Total Suspended Solids (TSS) mg/l
3. Ammoniacal Nitrogen as Nitrogen mg/l
4. Nitrate Nitrogen as Nitrogen mg/l
5. Total Nitrogen mg/l
6. Total Phosphorus mg/l
7. Others (e.g., pH, O&G, D.O., etc)
Type of Contract:
BOOT (Built Own Operate Transfer)
DBO (Design Built Operate)
DB (Design Built)
D (Design Only)
  

Name and Address of Principal:

Name:
Surname:
Address:
City:
Post Code: State:
Country: Other:
E-mail E-mail
 

Contact Name and Numbers for further information :

Name + Surname
Additional comments
Telephone Facsimile
E-mail E-mail
 

Estimated Date of Completion of the Project:

Enter the estimated date of completion